Refurbishment of the pool tank and walkway surround. The works involved the removal of the existing tiles, associated gulleys/channels and finger grips to the pool surround, cleaning and de-greasing the existing pool. The pool tank was overtiled with a combination of grade A and C tiles together with mosaic tiles to base/wall junctions. In addition to the pool tank the surround walkways were fully retiled together with a shower area. New gulley tiles, a stainless steel drainage channel, skirting upstand and new windows were installed.
St Albans Sports Centre, Ampleforth College, Ampleforth North Yorkshire.
Practical completion was achieved in May 2017.
£100,000
JCT Minor Works.
The scheme was completed on time, within budget to a very high-quality standard of finishings.
Refurbishment of Church Hall to provide thermal upgrades, new heating and enhanced facilities
FIND OUT MORE
Two new buildings to provide new access and egress points to the racecourse along with additional toilet facilities.
FIND OUT MORE
Extension to phase 2 of the Treadmills development to provide a new retail unit.
FIND OUT MORE