Refurbishment of the pool tank and walkway surround. The works involved the removal of the existing tiles, associated gulleys/channels and finger grips to the pool surround, cleaning and de-greasing the existing pool. The pool tank was overtiled with a combination of grade A and C tiles together with mosaic tiles to base/wall junctions. In addition to the pool tank the surround walkways were fully retiled together with a shower area. New gulley tiles, a stainless steel drainage channel, skirting upstand and new windows were installed.
St Albans Sports Centre, Ampleforth College, Ampleforth North Yorkshire.
Practical completion was achieved in May 2017.
£100,000
JCT Minor Works.
The scheme was completed on time, within budget to a very high-quality standard of finishings.
Refurbishment of listed building, The cell block on the former HMP Northallerton site was converted into office accommodation.