Refurbishment of Church Hall to provide thermal upgrades, new heating and enhanced facilities
FIND OUT MORE
Two new buildings to provide new access and egress points to the racecourse along with additional toilet facilities.
FIND OUT MORE
Extension to phase 2 of the Treadmills development to provide a new retail unit.
FIND OUT MORE
Refurbishment of existing betting bar to provide a new facility with an industrial theme
FIND OUT MORE
Refurbishment of Beyond Housing’s Redcar depot
FIND OUT MORE
New build project to provide Northallerton’s new cinema, retail units and civic square.
FIND OUT MORE
Refurbishment of 12 properties to “kick start” 700 Club’s Forever Homes Project.
FIND OUT MORE
Refurbishment of existing staff accommodation blocks to provide ensuite rooms and improved facilities.
FIND OUT MORE
Refurbishment and extension to provide enhanced jockey and racecourse technical facilities.
FIND OUT MORE
Refurbishment and extension to provide new bar, café and toilets
FIND OUT MORE
Refurbishment of listed building, The cell block on the former HMP Northallerton site was converted into office accommodation.
FIND OUT MORE
Mowbray Houses – The construction of 7 dwellings at Carlton Miniott, Thirsk.
FIND OUT MORE
Alteration and extension of existing facility to provide additional changing and improved facilities
FIND OUT MORE
The construction of 8 affordable dwellings for rent to people with local connections.
FIND OUT MORE
Refurbishment of the pool tank, walkway surround along with associated drainage, fencing and landscaping.
FIND OUT MORE
The works included for the internal alteration and refurbishment to provide a new draught lobby and the construction of a new mezzanine floor to extend the existing upper floor structure.
FIND OUT MORE
The works included the completion of the internal refurbishment and remedial works to the new extensions.
FIND OUT MORE
This project was carried out on behalf of Bootham boarding and day school set in the heart of York city centre.
FIND OUT MORE
Yarm Primary School, construction of two extensions to the existing school.
FIND OUT MORE
Alteration and extension to form new entrance lobby, kitchen, meeting rooms and toilets.
FIND OUT MORE
New structure formed over the former open central courtyard of the dairy yard to create 14 high quality internal stables with a perimeter walkway.
FIND OUT MORE
Erection of a new two storey Owners and Trainers facility.
FIND OUT MORE
Refurbishment of an existing dis-used dutch barn to provide a new design studio.
FIND OUT MORE
Refurbishment of the Monastery at Ampleforth College.
FIND OUT MORE
As part of our contractual commitment on the refurbishment of Beyond Housing’s Redcar Depot Moody Construction Ltd agree to deliver social value to deserving local communities in and around the East Cleveland area in which Beyond Housing provide housing and services. This commitment not only included a monetary commitment but also a pledge of time […]
READ MORE
Moody Construction Ltd have been awarded the new contract to construct the new grandstand at Thirsk racecourse and works are now well underway. THIRSK RACECOURSE GRANDSTAND Contract was awarded in October 2025 with works starting on site in with the demolition of the existing grandstand building and commencement of groundworks in November. The new building […]
READ MORE
Moody Construction currently have properties for sale
READ MORE
Moody Construction Ltd have recently completed two schemes to provide new public bars at Catterick Racecourse. THE LONGSHOTS BAR: A very much under used and outdated bar and betting facility was refurbished and extended to provide a much needed and improved space at the racecourse. Given it’s location within the enclosure, this bar caters specifically […]
READ MORE